session 2026-06-29: 4 graduations + RAW_HTML fold-in + OCR/docling pipelines launched; landscape mapped (reconvert-queue, indexer scope, sidecar gap); L1 pivot → CapableHands-clasp scope for tmrw Seb mtg
This commit is contained in:
@@ -41,12 +41,18 @@ permalink: claude-memory/memory
|
||||
- [ARC chamber v1-legacy cluster](project-arc-chamber-v1-legacy-cluster.md) — ARC's `content/chamber/**` is intentional v1-Chamber legacy (not drift); deferred to-do = gather into a presentable cluster as a record of development. Out of §5 clause-1 audit scope. Confirmed 2026-05-29.
|
||||
- [Studium engine telos — the chamber of voices](project-studium-engine-telos-chamber-of-voices.md) — **the ultimate goal, hold above the build plan**: David's childhood imaginary chamber of beloved hero-voices he took counsel from → enter into discourse with his library + have the voices converse amongst themselves, this time *accountably* (the engine's v1 was literally "the Chamber" — eloquent/unaccountable simulacra; this is the same ambition built grounded/citable/checkable). Why verbatim fidelity is load-bearing.
|
||||
- [Making sequence source set](project-making-sequence-source-set.md) — **COMPLETE against the ReadingList as of 2026-06-18** (reconciliation-verified); census of what's sourced where, sourced≠ingested (only Pos I in manifest), the **Handke-German decision** (original is source), the Levi drop-cap gate. Read before any Making/studium source work.
|
||||
- [Source library — link + dedupe](project-source-library-link-and-dedupe.md) — steward's master ebook library = `~/Documents/___The Library [ePub_AWZ3]/` (2190 ebooks, 180k files, messy nested; pre-organized subfolders `_2026 chamber source cleanup/`, `tmp calibre library for the chamber/`). GOAL: link chamber↔sources (provenance index) + dedupe. Seed = the 2026-06-29 fuzzy source-matcher (→ `_curation/reconvert-queue-2026-06-29.md`, 24/34 found). Real link needs EPUB/PDF internal metadata + edition-identity check, not just filenames.
|
||||
- [Character-as-image hazard](feedback-character-as-image-hazard.md) — some EPUBs render transliteration diacritics (ḥ/ʾ/ʿ) and non-Latin script (Hebrew words) as INLINE IMAGES; the standard image-drop SILENTLY MUTILATES them (PASS-BUT-FALSELY — gate passes, words corrupted). Tripwire = audit_cruft md_image count; INSPECT a sample before dropping; character-bearing images = CONTENT (map→Unicode, never drop). Found graduating Alter's Psalms (356 glyph-images) 2026-06-29; Alter parked pending a philological glyph-map (needs steward's Hebrew).
|
||||
- [Sidecar typology — protocol-dependent reading-indexes](project-sidecar-typology-protocol-dependent.md) — TWO layers: `.meta.json` structural sidecar = PROTOCOL-NEUTRAL, the general standard now (the bar for "graduated"); reading-indexes (rich YAML) = PROTOCOL-DEPENDENT (chavruta=where-to-open / debate=stance-map / connection-surfacing=cross-text join-keys), probably PLURAL — **don't design the schema yet**; settle corpus to gold + let protocols declare themselves first. Steward 2026-06-29.
|
||||
- Studium Engine — *tracker not yet established*; substantive moves in per-session memories (2026-05-15→) + the seed brief + now the **[architectural charter](reference-studium-engine-architectural-charter.md)** (the constitutional doc, 2026-06-15). Steps 0–7 built; chamber corpus CLEAN (1280 canonical). **Next: L2 pattern-finder on The Making sequence** (curate ~60 chamber works → grounded candidate primitives; engine grounds, David writes). Collaboration = [[feedback-studium-engine-sixtus-v-collaboration]].
|
||||
- [MemPalace 3.4.0 upgrade plan](project-mempalace-upgrade-3-4-0-plan.md) — scheduled post-heavy-work (ratified 2026-06-07): backup → upgrade → verify layers.py recency fix → re-test wing filter; migrate-wings + repair EXCLUDED. Basic Memory RETIRED 2026-06-07 (false-clean sync verdict; lessons → CM-AI substrate-failure-lessons-2026-06-07.md).
|
||||
- [L1 reliability](project-L1-reliability.md) — canonical workstream tracker established 2026-05-28 (Symmetria-pulse decision). Current state at top (updated 2026-06-06) + chronological log 2026-03-21→. **Status: BATON BACK — Seb replied 2026-06-13 (`cc25995` reply + `e2e94ab` cover note + `8f76bf2` benchmark-governance v1.1 §4.4, now in CM-AI local `main`). Steward set a brief L1 detour to engage it next session before returning to Studium Step 5. Read Seb's commits + this tracker before composing any response.** mindfabric-00 root-caused (temporal chain path) + restart-as-holding-pattern + backed up; PENDING-27 awaits jurist. Read tracker at /wake-up before composing L1 portion of any briefing.
|
||||
- [L1 reliability](project-L1-reliability.md) — canonical workstream tracker established 2026-05-28 (Symmetria-pulse decision). Current state at top (updated 2026-06-06) + chronological log 2026-03-21→. **Status: BATON BACK — Seb replied 2026-06-13 (`cc25995` reply + `e2e94ab` cover note + `8f76bf2` benchmark-governance v1.1 §4.4, now in CM-AI local `main`). Steward set a brief L1 detour to engage it next session before returning to Studium Step 5.** **UPDATE 2026-06-29: N6 deploy (#175) LANDED LIVE and HOLDS — multi-day wedge gone (CPU 100%→~21%), A1″ migration finally live (vector_chunks 19→26 cols); evidence in 2 UNCOMMITTED CM-AI docs (l1-post-n6-deploy-findings-2026-06-23 + l1-state-summary-for-jurist-gwern-brief-2026-06-22). Tracker current-state is STALE (06-06, predates the win). Seb meeting 2026-06-30 15:00. PRIORITY-1 morning task: stand up CapableHands as a BMF clasp (43M) — scope at `CM-AI/…/clasp-on-capablehands-scope-2026-06-29.md`, solves PENDING-41.** mindfabric-00 root-caused (temporal chain path); PENDING-27 awaits jurist. Read tracker at /wake-up before composing L1 portion.
|
||||
- [Be (laundromat)](project-be-laundromat.md) — canonical workstream tracker established 2026-06-08 (Seb-relay of locked decisions). Be = Skemantix startup (Seb+David) funding CapableMind's funding-ladder; **bridge, not venture**. Decisions LOCKED: entity/exit (CapableMind decoupled, grant-funded), pricing (Living $12.99/mo · Archive $69.99/yr · Memorial $49.99/yr · Renovate ~$199 · $8.99 floor), CF Self-Serve Agency + versioned-template-package infra. **a11y gate MERGED (Pat 100/100/100).** Pre-revenue: the WTP gate = renovate Pat → charge her. **Discipline: stop adding spec until the gate clears → nothing for executor on be until then.** Repo @ `f43a0fd`.
|
||||
|
||||
## Active Session
|
||||
- [Session 2026-06-29 — graduations, pipelines, and the clasp pivot](session-2026-06-29-corpus-graduations-pipelines-clasp-scope.md) — Long, two-arc day. CHAMBER: graduated **4 Making works** (Taylor→hermeneutics [pattern-setter: footnote family B + loud-abort guard], Virilio→french_theory [family C caret-chapter], Handke→literature/contemporary [+ size-sanity guard after a near-miss], Illich→environmental); **folded RAW_HTML into audit_cruft** (`9e99e07`, gates now agree, honest 1215/72→1220/70); built `clear_safe_html_residue.py` (cleared 11 svg/nav files, guard refused 9 incl. Arden's 10k-word near-deletion). **Launched overnight pipelines**: CapableHands olmOCR ×3 (Jonas→Mumford MoM I→II) + local docling ×3 DONE (**Technics&Civ clean → resolves the parked corrupt EPUB**, Speed&Politics, Burnout). **Mapped the whole landscape**: remaining Making EPUBs = Kindle-derived structure-lost sub-batch (need a tool built once); the 72→70 backlog = **mostly the reconvert-FLAGGED set** (source-matched 24/34 to the library); scoped the **metadata indexer** (keystone for link+dedupe+locate) + found the **1263-missing-sidecar gap** (952 Loebs = parseable H1 headers, never-YAML/never-stripped). PARKED: Alter Psalms (character-as-image), Kindle EPUBs, poetry-fenced_div. Then **PIVOT to L1** (Seb meeting tmrw 15:00): N6 deploy holds (wedge gone), scoped **standing up CapableHands as a BMF clasp** (43M). **PULLING THREAD: the clasp deploy on CapableHands TOMORROW MORNING (before 15:00 Seb call) — priority 1; indexer priority 2.** Q: can the clasp stand up end-to-end, or does the pairing-unknown become the Seb conversation? chamber `15ea750` + studium `844b207` pushed.
|
||||
|
||||
## Archived (2026-06-29 — graduations, pipelines, clasp pivot)
|
||||
- [Session 2026-06-28 — corpus settling: Musil graduated, Position I complete, gold-standard gate fixed](session-2026-06-28-corpus-settling-position-I-complete-gate-fixed.md) — Long, foundational day, spine set by the morning **maturation-of-the-chamber dialogue** (fidelity-without-trust; reading-is-unsolvable-and-that's-the-feature; language-as-notation; L2/engine=answerable-not-pure → `studium-engine/docs/the-maturation-of-the-chamber-a-dialogue-2026-06-28.md`; *settle the corpus we CAN perfect before the engine*). **Graduated English Musil** (Wilkins/Pike, `471bc53`) via TWO new reusable EPUB tools — `structure_from_ncx.py` + `clean_pandoc_html_residue.py` — proving the unify answer: ONE placement engine (`insert_chapter_headings`), TWO map-producers (EPUB NCX-anchors / OCR page-numbers); raw↔final prose WORD-IDENTICAL; source archived `~/__Making sequence sources/`. **Position I COMPLETE** (Weil×2, Musil-English [replaced French, steward-ruled], Arendt, Levi): Levi *Shame*-chapter hard-wrap reflowed (Shakespeare verse preserved) + re-scoped to the COMPLETE book (id→`levi-drowned-and-saved`); all 5 sha-current + sidecars matched. **Two policies set:** [[feedback-engine-sources-become-permanent-chamber-collection]] + [[feedback-notes-are-part-of-the-work-keep-footnotes-endnotes]]. **Runbook brought current** (`epub_ncx_markdown` path; olmOCR/ocrmac CORRECTED — two-tool by column: single→olmOCR, multi→ocrmac, complementary not retired). **GOLD-STANDARD GATE FIXED** (`af17dde`): `verify_conversion` had a PASS-BUT-FALSELY (passed cruft=0 on Taylor's 59 raw `<sup>`) → added `RAW_HTML` gate → trustworthy audit **1187/91→1152/126** (35 false-passes caught). All committed+PUSHED (chamber `af17dde` skemantix, studium `cdd8d4a` github). **PULLING THREAD: the graduation batch — work the ~18 Making EPUBs + ~9 PDF/OCR + the audit's 126 fails into the chamber, properly (KEEPING NOTES), against the now-trustworthy gate; Taylor-redone-WITH-notes is first + pattern-setter.** Q: new-Making-graduations first or the 126 audit-fails first — which serves the engine sooner? Two greenfield research sweeps (genealogy/temporal; multi-voice) + multilingual-NLI validation = the engine phase, gated on corpus.
|
||||
|
||||
## Archived (2026-06-28 — corpus settling: Musil graduated, Position I complete, gate fixed)
|
||||
|
||||
Reference in New Issue
Block a user