chore(memory): Basic Memory trial begins — sync normalization baseline (283 files)
Basic Memory v0.21.6 first sync over the live memory dir (steward-authorized live-dir trial, Option A 2026-06-06): adds permalink: to frontmatter, refolds long YAML description lines, strips final newlines. Bodies untouched — verified via full diff classification. From this commit forward, any diff in claude/memory shows only what Basic Memory or the session writes. Trial design: MemPalace untouched as incumbent; git status check on this dir at every wrap; end-of-day evaluation (recall quality, sync robustness, rebuild-from-files, malformed-file behavior). Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
This commit is contained in:
co-authored by
Claude Opus 4.8
parent
161fad7ae2
commit
3f9a89b00c
@@ -1,9 +1,12 @@
|
||||
---
|
||||
name: bge-m3 full re-mine plan — 2026-05-11
|
||||
description: The ONE job for the cleared context. Full chamber-library re-mine on PR #442's bge-m3 binding, replacing the mxbai 639k baseline. Steward away ~48 hours; remote-monitor via /remote-control. Pulling thread for the next session; everything else is deferred.
|
||||
description: The ONE job for the cleared context. Full chamber-library re-mine on
|
||||
PR
|
||||
type: project
|
||||
originSessionId: a156edbb-0c3d-4285-b3ed-f5a45b8dda66
|
||||
permalink: claude-memory/project-bge-m3-full-remine-plan-2026-05-11
|
||||
---
|
||||
|
||||
# bge-m3 full re-mine plan
|
||||
|
||||
> *"Do things once, correctly, with lasting integrity. Choose what is proportionate, fitting, and durable. Build what you will not need to rebuild."*
|
||||
@@ -159,4 +162,4 @@ Vector data is durable across mempalace versions. No re-mine needed at the trans
|
||||
|
||||
**Re-mine the chamber-library cleanly on bge-m3, survive the 48 hours without writer collisions or HNSW corruption, report status when steward pings.**
|
||||
|
||||
Everything else waits.
|
||||
Everything else waits.
|
||||
Reference in New Issue
Block a user