chore(memory): Basic Memory trial begins — sync normalization baseline (283 files)

Basic Memory v0.21.6 first sync over the live memory dir (steward-authorized
live-dir trial, Option A 2026-06-06): adds permalink: to frontmatter, refolds
long YAML description lines, strips final newlines. Bodies untouched —
verified via full diff classification. From this commit forward, any diff in
claude/memory shows only what Basic Memory or the session writes.

Trial design: MemPalace untouched as incumbent; git status check on this dir
at every wrap; end-of-day evaluation (recall quality, sync robustness,
rebuild-from-files, malformed-file behavior).

Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
This commit is contained in:
David F Glidden
2026-06-06 09:52:17 +02:00
co-authored by Claude Opus 4.8
parent 161fad7ae2
commit 3f9a89b00c
283 changed files with 2055 additions and 620 deletions
@@ -1,9 +1,28 @@
---
name: Session 2026-05-22 — β status-block housekeeping commit (e7cd960) + two MemPalace status checks; spec stamps + cross-refs reconciled across 4 files; frontmatter promoted DRAFT → OPERATIVE; §5 Code Binding Contract DRAFT → AUTHORED; pulling thread still Stage F dwellings cluster; literal question is whether next day-shape is fit for Stage F or another fragmented day
description: "Light, clean session executing β from plan-day-2026-05-21.md (status-block housekeeping). Single atomic commit `e7cd960` reconciled stamps across content-typology / frontmatter / AldineXXI Companion Spec Index / ARC CLAUDE.md (4 files, 9+/9− lines). Live-State Discipline drove scope expansion from 4 → 6 edits — surfaced + steward-authorized cleanly. Two MemPalace status checks bracketed the day: morning showed #1440/#1538 fixes on develop with no release-prep yet; evening showed +13 commits on develop, #1540 merged with partial CHUNK_SIZE coverage (audit pathway), #1569 still OPEN + CONFLICTING for the remaining four sites including tool_diary_write — release-prep still not begun. Branch sits at e7cd960, 27 ahead of main, 1 ahead of remote (intentionally not pushed; Path B continues — merge + deploy both wait for Stage F to honor (c) Compass principle + Second Edition lockstep at first reader-facing event). γ Stage F prep deliberately not attempted; the day's energy budget closed at β + responsiveness, not advancement. Pulling thread unchanged: Stage F dwellings cluster session. Literal question: is the next day-shape fit for Stage F (~3h focused) or another fragmented day where β-style closure is the right posture?"
name: Session 2026-05-22 — β status-block housekeeping commit (e7cd960) + two MemPalace
status checks; spec stamps + cross-refs reconciled across 4 files; frontmatter promoted
DRAFT → OPERATIVE; §5 Code Binding Contract DRAFT → AUTHORED; pulling thread still
Stage F dwellings cluster; literal question is whether next day-shape is fit for
Stage F or another fragmented day
description: 'Light, clean session executing β from plan-day-2026-05-21.md (status-block
housekeeping). Single atomic commit `e7cd960` reconciled stamps across content-typology
/ frontmatter / AldineXXI Companion Spec Index / ARC CLAUDE.md (4 files, 9+/9− lines).
Live-State Discipline drove scope expansion from 4 → 6 edits — surfaced + steward-authorized
cleanly. Two MemPalace status checks bracketed the day: morning showed #1440/#1538
fixes on develop with no release-prep yet; evening showed +13 commits on develop,
#1540 merged with partial CHUNK_SIZE coverage (audit pathway), #1569 still OPEN
+ CONFLICTING for the remaining four sites including tool_diary_write — release-prep
still not begun. Branch sits at e7cd960, 27 ahead of main, 1 ahead of remote (intentionally
not pushed; Path B continues — merge + deploy both wait for Stage F to honor (c)
Compass principle + Second Edition lockstep at first reader-facing event). γ Stage
F prep deliberately not attempted; the day''s energy budget closed at β + responsiveness,
not advancement. Pulling thread unchanged: Stage F dwellings cluster session. Literal
question: is the next day-shape fit for Stage F (~3h focused) or another fragmented
day where β-style closure is the right posture?'
metadata:
type: project
originSessionId: e7f41d7a-d68c-4525-86da-db087df2b7c6
permalink: claude-memory/session-2026-05-22-beta-housekeeping-mempalace-checks
---
# Session 2026-05-22 — β status-block housekeeping + MemPalace status checks
@@ -142,4 +161,4 @@ Secondary check at wake: has MemPalace cut `chore/release-3.3.6-prep`? Quick `gh
- **Yesterday's plan**: `~/.claude/projects/-Users-davidglidden/memory/plan-day-2026-05-21.md` — three light options laid out; α + β executed, γ deferred
- **Yesterday's session memory**: `~/.claude/projects/-Users-davidglidden/memory/session-2026-05-20-evening-stage-e-closure-adr-007.md` — Stage E closure context
- **Live-State Discipline (the principle driving today's scope expansion)**: `~/.claude/projects/-Users-davidglidden/memory/feedback-live-state-discipline.md`
- **Branch state at session-end**: `docs/spec-extraction-2026-05` at `e7cd960`, 27 commits ahead of main, 1 ahead of remote, working-tree noise expected (pre-existing font-backup directories)
- **Branch state at session-end**: `docs/spec-extraction-2026-05` at `e7cd960`, 27 commits ahead of main, 1 ahead of remote, working-tree noise expected (pre-existing font-backup directories)