session 2026-06-07: bidirectional audit + Road to Stage G + Wave 1 closed (13/15 ruled; PENDING-30..33 to jurist; /spec-code-audit built; session memory + ledger + tracker append)

This commit is contained in:
David F Glidden
2026-06-07 11:02:37 +02:00
parent df8d334595
commit 6c8081705d
5 changed files with 135 additions and 3 deletions
+1 -1
View File
@@ -23,7 +23,7 @@ The single place proposed skills live so they don't evaporate between sessions.
| Skill | Kind | One-line | Origin | Status |
|-------|------|----------|--------|--------|
| `/spec-code-audit` | create | Audit live code against a spec-contract section clause-by-clause; classify each gap; deliverable = gap-map. | 2026-05-29 | **DEFERRED 2026-06-05** — ARC justification ended (Stage G is the jurist's read; corpus goes stable); L1 justification real but untested. Condition: build at the first L1 spec-vs-code audit, generalizing from the ARC gap-map artifact. |
| `/spec-code-audit` | create | Audit live code against a spec-contract section clause-by-clause; classify each gap; deliverable = gap-map. | 2026-05-29 | **BUILT 2026-06-07** — deferral condition met from the ARC direction (Seb's completeness question revived the justification; steward authorized build-from-this-run). Generalizes the four-pass bidirectional method proven on the full ARC audit (`_audits/spec-code-full-audit-2026-06-07.md`: 172 findings, 66-agent fan-out, adversarial refutation, 2 kills). Skill at `~/.claude/skills/spec-code-audit/`. Serves L1's first spec-vs-code audit as originally intended. |
| `bmf-diagnose` | create | N6 `EXPLAIN`-first root-cause method for L1/BMF storage pathologies. | 2026-05-27 | **AUTHORIZED 2026-06-05** (build at next L1 diagnostic need). |
| `mempalace-diagnose` (was `mcp-drop-diagnose`) | create | Upstream-issue-first method for MemPalace/MCP failures (proved on #1495; HNSW quarantine + search errors 2026-06-05). | 2026-06-02 | **AUTHORIZED 2026-06-05**. *Merge with bmf-diagnose RETRACTED same evening* — the merge was itself the MemPalace≠BMF conflation (steward's 3rd correction): one substrate we build, one we merely use. Two skills, two names. |
| `/pre-build-audit` | create | The four-pass *scope-claimed-vs-scope-tested per claim, with substrate evidence* discipline. | 2026-05-28 | **AUTHORIZED 2026-06-05**, build-on-next-big-build (cascade Stage 2 / vignette Phase 1 / L1). |