From bf4239a39fccb8083b8560a6cab897843323d97c Mon Sep 17 00:00:00 2001 From: David F Glidden Date: Sat, 28 Mar 2026 10:53:54 +0100 Subject: [PATCH] =?UTF-8?q?docs:=20REVIEWED-17=20=E2=80=94=20ICP-19=20Mand?= =?UTF-8?q?ated=20External=20Review=20authorized?= MIME-Version: 1.0 Content-Type: text/plain; charset=UTF-8 Content-Transfer-Encoding: 8bit Closes AF-7. Lifts GOV-05/06 suspension clauses. Four open items before first review cycle. Co-Authored-By: Claude Opus 4.6 (1M context) --- REVIEWED.md | 7 ++++++- 1 file changed, 6 insertions(+), 1 deletion(-) diff --git a/REVIEWED.md b/REVIEWED.md index 8f06a1c..f6e9348 100644 --- a/REVIEWED.md +++ b/REVIEWED.md @@ -64,4 +64,9 @@ originally specified file (job-store.ts) is the correct application of **Date:** 2026-03-28 **Decision:** AUTHORIZED **Notes:** Five-source convergence (Harrison, Vico, Leopardi, Levinas, O'Neill) — strongest in the registry. Survived adversarial review without modification (priority 1). DN-GOV-08 evaluation passed: metrics function as monitoring surfaces, not obligation-generators (the score triggers review, not action). Two pre-authorization amendments incorporated: RA-I16-01 (obligation registration validity — closes FM-R4 at point of occurrence, not deferred to drift marker) and SD-I16-01 (capability_differential estimated from behavioral signals only — tracks engagement, not identity). Experienced-interlocutor prohibition absolute: familiarity deepens obligation, never relaxes it. Service-as-dominion detection marker included (anticipatory behavior correlated with asymmetry depth). L1 contamination profile: critical, monotonic — the contamination looks like good service. Cluster A now complete (I15, I16, I17). -**Post-authorization action:** AF-7/C-R2 external audit mechanism advances immediately. The compound failure (I16 + I17 = self-confirming system) has monitoring but no enforcement until AF-7 exists. \ No newline at end of file +**Post-authorization action:** AF-7/C-R2 external audit mechanism advances immediately. The compound failure (I16 + I17 = self-confirming system) has monitoring but no enforcement until AF-7 exists. + +## REVIEWED-17 — ICP-19: Mandated External Review +**Date:** 2026-03-28 +**Decision:** AUTHORIZED +**Notes:** Closes AF-7 — the corpus's single most consequential gap. Elevates C-R2 from process recommendation to constitutional requirement. Roman strand (provocatio/intercessio) + relational strand (formative contamination detection). Three institutional phases: founding (steward-appointed human reviewer), mature (Founders Circle external panel), deployment (independent reviewer with contractual standing — hard deadline). Not-embedded criterion defined: not sharing L1 substrate, not system interlocutor, unmediated record access, unedited findings. Findings trigger HOLD (not advisory). Three-cycle FM-R4 marker prevents decorative compliance. DN-GOV-08 evaluation passed: holds open the space. **Lifts GOV-05 and GOV-06 suspension clauses** — bounded self-repair and temporal authorization shift now operative as design commitments. Four open items before first review cycle: Luke's confirmation, findings threshold classification, governed operations scope, Mauss/nexum Phase 2 deferral. L1 contamination: critical, monotonic — formative contamination is the primary threat and external review is the only mechanism operating outside the formative frame. \ No newline at end of file