memory: bundle accumulated 04-17/26 + lock ARC about-page architecture

Safety checkpoint before deep-audit Phase 0 of the ARC repo. Steward-authorized
commit-everything for rollback safety.

ARC architectural locks (2026-04-26 evening):
- Path 1 enfilade structure (separate Colophon and Lex items)
- 8-door enfilade locked: Colophon · Lex · Framework · Vignette · Attention ·
  Chamber · Tools · Now (+ Bio quiet link)
- Adsum and threshold-hic as two distinct texts on the reflowed About page
  (steward verbatim: "They are certainly not the same text")

ARC consolidation pass (canonical tracker project-arc-rework.md, +~700 lines):
fold 04-23 evening (Norris read), 04-24 (lex-method authored, posture cluster,
§XII Sidenotes, ARC CLAUDE.md cleanup), 04-25 (marks cluster, colophon-at-scale,
full Vico/Harrison lex-chain), 04-26 (chamber-library walk, cluster scaffolds,
canonical-tracker discipline surfaced).

Sibling-file integration: four 2026-04-26 frame files folded into the canonical
tracker (Integrations A/B/C/D) with INTEGRATED redirect notices retained as
audit trail.

New durable feedback memories:
- feedback-canonical-workstream-tracker-discipline (umbrella drift surfaced
  2026-04-26 by steward; proposes /wake-up + /wrap-up amendments)
- feedback-catalogues-stale-walk-trees (steward feedback on chamber-library
  catalogue currency)

Implementation plan drafted for the coming week: Phase 0 deep audit → Phase 5
cleanup, with steward additions on second pass (deep audit; Chamber v1 as own
browsable archive; clean rebuild of cluster sources rather than moving test
artifacts as canon).

Also bundled (untracked accumulation since 04-17):
- ~24 session memory + ledger files for 04-17 through 04-26 work
- ~10 feedback memories (BMF + ARC + working-method)
- 5 project memories (lex-as-method, strunk-white queue, plus today's four)
- 4 user memories (duality-rules, formation-practice, foundation-work, humic-layer)

Steward-side modifications also in this commit: ~/CLAUDE.md, bin/bmf-start.sh,
open-tasks.md, project-focus-april-may.md, session-2026-04-17 — all
pre-existing, not from today's session.

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
This commit is contained in:
David F Glidden
2026-04-26 14:52:14 +02:00
co-authored by Claude Opus 4.7
parent 14801280dd
commit e9e772d69c
49 changed files with 7101 additions and 42 deletions
+2 -2
View File
@@ -2,11 +2,11 @@
name: Project focus April–May 2026
description: L2 parked (steward needs thinking time, L1 not yet reliable). L1 scaling + agent circles are the focus until end of May. Seb wants L1 ready for anyone to use by end of May.
type: project
originSessionId: a3ddbf34-da48-4129-acba-658f2f869783
---
**L2 governance: PARKED** as of 2026-04-10. Steward needs time to think. No point advancing L2 while L1 substrate isn't wrinkle-free. Will resume soon — no timeline.
**L1: PRIMARY FOCUS.** Seb wants L1 ready to scale (anyone can use it) by end of May 2026. David and Seb combining efforts on L1 + agent-circle material until then.
**L1: PRIMARY FOCUS.** Seb wants L1 ready to scale (anyone can use it) by end of May 2026. **Steward actively on L1 production work alongside Seb** (re-affirmed 2026-04-19 — Seb too spread thin to carry alone; steward's role extends from stewardship/jurist into hands-on L1 reliability work, audit drafting, diagnostic test branches, PENDING drafting, etc.).
**Why:** L1 reliability is prerequisite for everything downstream. L2 constitutional work requires full-depth steward attention, not sprint-squeezed sessions. The dependency chain is honest: get the substrate right first.