Files
dotfiles/claude/memory/plan-day-2026-05-21.md
David F GliddenandClaude Opus 4.8 3f9a89b00c chore(memory): Basic Memory trial begins — sync normalization baseline (283 files)
Basic Memory v0.21.6 first sync over the live memory dir (steward-authorized
live-dir trial, Option A 2026-06-06): adds permalink: to frontmatter, refolds
long YAML description lines, strips final newlines. Bodies untouched —
verified via full diff classification. From this commit forward, any diff in
claude/memory shows only what Basic Memory or the session writes.

Trial design: MemPalace untouched as incumbent; git status check on this dir
at every wrap; end-of-day evaluation (recall quality, sync robustness,
rebuild-from-files, malformed-file behavior).

Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
2026-06-06 09:52:17 +02:00

6.9 KiB
Raw Permalink Blame History

name, description, metadata, permalink
name description metadata permalink
plan-day-2026-05-21 Day-plan for Wednesday 2026-05-21 — travel Barcelona → Paris (6am flight), last taxes filing with Marie, 3h rehearsal. 2–3h max work time, fragmented. Closure + light maintenance posture; not a Stage F day. Three light options laid out (α Phase 6 wrap-up; β status-block housekeeping; γ Stage F prep document). Default: α first, β if energy holds; γ only if a third hour materialises.
type originSessionId
project planning-2026-05-20-evening
claude-memory/plan-day-2026-05-21

Day Plan — 2026-05-21 (Wednesday, Barcelona → Paris)

Frame

  • 4am wake; 6am flight from Barcelona; arrive Paris mid-morning
  • Last taxes filing with Marie (procedurally easy; emotionally weighted — sad, the steward named it)
  • One 3-hour rehearsal in afternoon
  • 2–3h max work time, fragmented across the day
  • Energy curve: low-to-medium throughout; no focused-implementation block possible
  • τὸ πρόσφορον — what is fitting includes the time the day actually gives

What does NOT happen today

  • Stage F (dwellings cluster + new Compass sigils). Wrong day for it. Needs fresh-energy focused block (~3h continuous, deep concentration across site.hs + templates + SCSS + multiple type routes). Deferred to next focused-energy day.
  • Merge + deploy. Per Path B chosen 2026-05-20 evening: merge and deploy wait until Stage F closes the corpus-Compass gap. Today's branch sits where it is.
  • New spec authoring. None is owed.
  • Composition. No new prose work scheduled. Hagen Quartett Hommage held with grief.

What CAN happen today (choose based on energy)

Three light items, any single one fits a ~1h window between travel / taxes / rehearsal:

Option α — Phase 6 wrap-up (carried from 2026-05-20)

Three items remaining from yesterday's wrap-up:

  • /wrap-up ritual invocation (steward action — captures session memory cleanly via the skill)
  • Final commit shape check — confirm both remotes carry today's branch state (already verified 2026-05-20 evening; confirm again if anything shifted)
  • Read yesterday's end-of-day record in plan-day-2026-05-20.md to re-orient

End-of-day record + project-arc-rework.md canonical tracker update + remote verification were completed 2026-05-20 evening before sign-off, so most of Phase 6 is done. What remains is the /wrap-up skill invocation itself.

~15–30 min. Fully mechanical. Best done first to clear the deck and arrive in the new day cleanly.

Option β — Status-block housekeeping commit

Small follow-on for the spec corpus's stale stamps (per the 2026-05-20 "to do" inventory):

  • content-typology-specification.md status header: §2 / §3 / §4 / §6 stamps from "DRAFT, pending Stage E" → "AUTHORED, pending Stage G jurist review"
  • content-typology-specification.md §1 header: DRAFT → LOCKED (all 14 types individually LOCKED)
  • content-typology-specification.md §5 Code Binding Contract: LOCKED stamp if substance is complete, or named gap surfaced
  • essay-versioning-specification.md + frontmatter-specification.md header DRAFT stamps: read-through to confirm whether stale or accurate; reconcile

Single atomic commit. ~45–60 min. Low energy; mostly reading + small edits. Brings spec corpus's stated state in line with its actual state — Live-State Discipline applied to the headers themselves.

Option γ — Stage F prep document

A step-by-step implementation plan for the dwellings cluster session (without implementing). Maps the work cleanly so the focused-energy day can execute without re-deriving scope:

  • The Photo Essay ⊙→◧ swap: exact site.hs lines, template references, route impact
  • Dwellings cluster ⊙ for Meditation + Reverie: route file structure, index template, listing logic
  • New Compass slots: ❦ Hommage, ⁂ Heteronym, ☾ Dream (cosmological pairing rationale per content-typology §1)
  • Default.html Compass-row template edits
  • Per-type index pages (HTML structure, frontmatter, what each lists)
  • Reading-test path for each new slot
  • Atomic-commit shape

Writes to docs/AldineXXI-Codex/drafts/stage-f-dwellings-cluster-plan-2026-05-21.md or similar. ~60–75 min. Higher cognitive load than α / β; needs reading and structural thinking. Best if energy permits.

If today actually delivers ~2h of work-time:

  1. First — Option α (Phase 6 wrap-up closure). ~15–30 min. Closes yesterday cleanly via the /wrap-up skill.
  2. Second (if energy holds, post-rehearsal or before bed) — Option β (status-block housekeeping). ~45–60 min. Mechanical and satisfying; cleans the spec corpus without requiring deep concentration.

If only ~1h is available: just α. Closure beats new work on a travel day.

If energy holds beyond α + β and a third hour materialises: Option γ. But don't push.

If energy doesn't materialise at all today: that is also fine. The branch sits at 04f9d8b, 26 commits ahead of main, pushed both remotes. Nothing is at risk. Tomorrow or whenever is a new day.

Branch state at session-start

docs/spec-extraction-2026-05 at 04f9d8b, 26 commits ahead of main, pushed both remotes (origin Skemantix + github-backup). Working tree clean (font-backup directories untouched; pre-existing noise carried forward).

What's pulling (carried from 2026-05-20)

  • Stage F dwellings cluster session — waiting for fresh-energy day (≥3h continuous block; not today)
  • Merge + deploy — gated on Stage F per Path B (chosen 2026-05-20 evening)
  • Hagen Quartett Hommage — held with grief

Discipline reminders

  • Travel days are good for orientation + reading + planning. Bad for focused implementation.
  • Taxes filing with Marie has its own emotional load. Procedurally easy, the steward said; sad. Don't sandwich work blocks tightly around it. The grief gets its own room.
  • Three-hour rehearsal is high-energy work. Music-presence is its own demand. Don't crowd it with anticipation.
  • Bien-fait per Prime Directive — proportion, fittingness, durability. A day with three external demands is not a day to also push major implementation work.
  • The day's posture is closure + light maintenance, not advancement. Both are honorable. τὸ πρόσφορον — what is fitting includes the time the task requires.

Pulling thread + literal question

Pulling thread: nothing pulls forcefully. The branch is at rest; Stage F waits; the merge and deploy wait. Today's posture is responsiveness to what the day actually gives, not advancement.

Literal question for next-Claude (carried from 2026-05-20): How is the steward's energy after the morning's taxes filing with Marie — and what shape of work, if any, fits the afternoon?


Plan composed 2026-05-20 evening Barcelona, ahead of the steward's 4am wake. Wait for the steward's check-in; do not assume direction. Hold space for grief; offer light options when work-time arrives. Hasten when the work is ready. Not before.