Files
dotfiles/claude/memory/project-be-laundromat.md

3.5 KiB
Raw Permalink Blame History

name, description, metadata
name description metadata
project-be-laundromat Canonical workstream tracker for Be — the Skemantix laundromat-model website venture (Seb + David) that funds CapableMind's funding-ladder. Locked decisions (entity, pricing, infra, the WTP gate) + chronological moves. Read at /wake-up before any be work; append at /wrap-up.
node_type type originSessionId
memory project 9d18bf5e-975b-4d16-824d-3201c1d6d75c

Be — workstream tracker

Be = a Skemantix startup (uses existing Stripe/infra as launch vehicle), Seb + David, a revenue generator and "first laundromat experiment" — small managed-website service funding CapableMind's funding-ladder tiers 1–2. A bridge, not a venture. Repo: ~/_Dev/be. Seeded 2026-06-06; entered 2026-06-07.

Locked decisions (Seb relay 2026-06-08)

  • Entity / exit: Be = Skemantix startup. CapableMind decoupled — grant-funded (AI-for-All; Peter's task-force ties; CapableCloud = sovereignty pillar), stays focused; friendly acquirer if/when Be succeeds.
  • Pricing (soft): Living $12.99/mo annual-commit (or $14.99 no-commit) · Archive $69.99/yr · Memorial $49.99/yr · Renovate ~$199. $8.99 floor = acquisition-discount budget (no lite tier). Domain + owner@domain email included; mailbox resold (Proton — never run our own). Inflation-adjusted only every 5y; dignified cancellation.
  • Infra: CF Self-Serve Agency Program (20% Workers, Tenant API, transferability — confirmed). Template = versioned package, sites consume it (Starlight model).

Built / proven (as of 2026-06-08)

  • Template generated from corpus → verified → dogfooded (Pat flat + Sheila nested) → package + thin-site workspace, builds green. Corpus → 0000–0024.
  • a11y gate MERGED (our 06-07 evening branch: axe 0 / Lighthouse 100s) — Pat 100/100/100. ✓

Analysis (Seb)

  • Fin-model + LTV (revised on our EU+NA research): beachhead Y5 ≈ $40k/$160k/$485k; LTV:CAC ≈ 8–10:1 → bridge funding ladder tiers 1–2.
  • Ceiling (§8): cPanel-WP refugee cohort = CAC-gated ~$2–20M path, after the beachhead.
  • Objective function (growth-discipline): maximize customers within the hours-cap, subject to economics floor + WTP gate + risk thresholds.

The gate (LAUNCH.md is the live to-do; pre-revenue)

  1. CF Agency signup (lock the Global API key) + Stripe products (Skemantix account).
  2. Template customer-ready (fonts; Pat's images — a11y done ✓).
  3. Renovate Pat (approved) → charge her (~$149 + $69.99/yr). ← THE GATE (WTP).
  4. Then Sheila + n=3–5.

Discipline (steward-relayed): stop adding spec until the gate clears. → Gate items are steward/Seb actions (CF signup, Stripe, charging Pat), NOT executor spec/SCSS work. Nothing for the executor to pick up on be until the gate clears; be parked clean. See skill-harvest-register for tracker-discipline lineage.

Chronological

  • 2026-06-06 — be seeded as new workstream (laundromat funding CapableMind); 7 steward docs; Seb co-wrote spec corpus 0004–0018, philosophy, Alexander pattern language, Portugal dual-domicile entity.
  • 2026-06-07 (eve) — be entered; LAUNCH.md + pattern-language read; a11y-gate branch built (axe 0 ×47, LH 100s), held unpushed.
  • 2026-06-08 — Seb update relayed: decisions LOCKED (above); a11y gate MERGED (Pat 100/100/100); strategy coherent end-to-end; pre-revenue, the WTP gate (charge Pat) is the one thing that matters. Repo HEAD f43a0fd (06-07 18:34). Executor turned back to ARC W3R.2.