Basic Memory v0.21.6 first sync over the live memory dir (steward-authorized live-dir trial, Option A 2026-06-06): adds permalink: to frontmatter, refolds long YAML description lines, strips final newlines. Bodies untouched — verified via full diff classification. From this commit forward, any diff in claude/memory shows only what Basic Memory or the session writes. Trial design: MemPalace untouched as incumbent; git status check on this dir at every wrap; end-of-day evaluation (recall quality, sync robustness, rebuild-from-files, malformed-file behavior). Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
6.9 KiB
name, description, metadata, permalink
| name | description | metadata | permalink | ||||
|---|---|---|---|---|---|---|---|
| plan-day-2026-05-21 | Day-plan for Wednesday 2026-05-21 — travel Barcelona → Paris (6am flight), last taxes filing with Marie, 3h rehearsal. 2–3h max work time, fragmented. Closure + light maintenance posture; not a Stage F day. Three light options laid out (α Phase 6 wrap-up; β status-block housekeeping; γ Stage F prep document). Default: α first, β if energy holds; γ only if a third hour materialises. |
|
claude-memory/plan-day-2026-05-21 |
Day Plan — 2026-05-21 (Wednesday, Barcelona → Paris)
Frame
- 4am wake; 6am flight from Barcelona; arrive Paris mid-morning
- Last taxes filing with Marie (procedurally easy; emotionally weighted — sad, the steward named it)
- One 3-hour rehearsal in afternoon
- 2–3h max work time, fragmented across the day
- Energy curve: low-to-medium throughout; no focused-implementation block possible
- τὸ πρόσφορον — what is fitting includes the time the day actually gives
What does NOT happen today
- Stage F (dwellings cluster + new Compass sigils). Wrong day for it. Needs fresh-energy focused block (~3h continuous, deep concentration across site.hs + templates + SCSS + multiple type routes). Deferred to next focused-energy day.
- Merge + deploy. Per Path B chosen 2026-05-20 evening: merge and deploy wait until Stage F closes the corpus-Compass gap. Today's branch sits where it is.
- New spec authoring. None is owed.
- Composition. No new prose work scheduled. Hagen Quartett Hommage held with grief.
What CAN happen today (choose based on energy)
Three light items, any single one fits a ~1h window between travel / taxes / rehearsal:
Option α — Phase 6 wrap-up (carried from 2026-05-20)
Three items remaining from yesterday's wrap-up:
/wrap-upritual invocation (steward action — captures session memory cleanly via the skill)- Final commit shape check — confirm both remotes carry today's branch state (already verified 2026-05-20 evening; confirm again if anything shifted)
- Read yesterday's end-of-day record in
plan-day-2026-05-20.mdto re-orient
End-of-day record + project-arc-rework.md canonical tracker update + remote verification were completed 2026-05-20 evening before sign-off, so most of Phase 6 is done. What remains is the /wrap-up skill invocation itself.
~15–30 min. Fully mechanical. Best done first to clear the deck and arrive in the new day cleanly.
Option β — Status-block housekeeping commit
Small follow-on for the spec corpus's stale stamps (per the 2026-05-20 "to do" inventory):
content-typology-specification.mdstatus header: §2 / §3 / §4 / §6 stamps from "DRAFT, pending Stage E" → "AUTHORED, pending Stage G jurist review"content-typology-specification.md§1 header: DRAFT → LOCKED (all 14 types individually LOCKED)content-typology-specification.md§5 Code Binding Contract: LOCKED stamp if substance is complete, or named gap surfacedessay-versioning-specification.md+frontmatter-specification.mdheader DRAFT stamps: read-through to confirm whether stale or accurate; reconcile
Single atomic commit. ~45–60 min. Low energy; mostly reading + small edits. Brings spec corpus's stated state in line with its actual state — Live-State Discipline applied to the headers themselves.
Option γ — Stage F prep document
A step-by-step implementation plan for the dwellings cluster session (without implementing). Maps the work cleanly so the focused-energy day can execute without re-deriving scope:
- The Photo Essay ⊙→◧ swap: exact site.hs lines, template references, route impact
- Dwellings cluster ⊙ for Meditation + Reverie: route file structure, index template, listing logic
- New Compass slots: ❦ Hommage, ⁂ Heteronym, ☾ Dream (cosmological pairing rationale per content-typology §1)
- Default.html Compass-row template edits
- Per-type index pages (HTML structure, frontmatter, what each lists)
- Reading-test path for each new slot
- Atomic-commit shape
Writes to docs/AldineXXI-Codex/drafts/stage-f-dwellings-cluster-plan-2026-05-21.md or similar. ~60–75 min. Higher cognitive load than α / β; needs reading and structural thinking. Best if energy permits.
Recommended sequencing
If today actually delivers ~2h of work-time:
- First — Option α (Phase 6 wrap-up closure). ~15–30 min. Closes yesterday cleanly via the
/wrap-upskill. - Second (if energy holds, post-rehearsal or before bed) — Option β (status-block housekeeping). ~45–60 min. Mechanical and satisfying; cleans the spec corpus without requiring deep concentration.
If only ~1h is available: just α. Closure beats new work on a travel day.
If energy holds beyond α + β and a third hour materialises: Option γ. But don't push.
If energy doesn't materialise at all today: that is also fine. The branch sits at 04f9d8b, 26 commits ahead of main, pushed both remotes. Nothing is at risk. Tomorrow or whenever is a new day.
Branch state at session-start
docs/spec-extraction-2026-05 at 04f9d8b, 26 commits ahead of main, pushed both remotes (origin Skemantix + github-backup). Working tree clean (font-backup directories untouched; pre-existing noise carried forward).
What's pulling (carried from 2026-05-20)
- Stage F dwellings cluster session — waiting for fresh-energy day (≥3h continuous block; not today)
- Merge + deploy — gated on Stage F per Path B (chosen 2026-05-20 evening)
- Hagen Quartett Hommage — held with grief
Discipline reminders
- Travel days are good for orientation + reading + planning. Bad for focused implementation.
- Taxes filing with Marie has its own emotional load. Procedurally easy, the steward said; sad. Don't sandwich work blocks tightly around it. The grief gets its own room.
- Three-hour rehearsal is high-energy work. Music-presence is its own demand. Don't crowd it with anticipation.
- Bien-fait per Prime Directive — proportion, fittingness, durability. A day with three external demands is not a day to also push major implementation work.
- The day's posture is closure + light maintenance, not advancement. Both are honorable. τὸ πρόσφορον — what is fitting includes the time the task requires.
Pulling thread + literal question
Pulling thread: nothing pulls forcefully. The branch is at rest; Stage F waits; the merge and deploy wait. Today's posture is responsiveness to what the day actually gives, not advancement.
Literal question for next-Claude (carried from 2026-05-20): How is the steward's energy after the morning's taxes filing with Marie — and what shape of work, if any, fits the afternoon?
Plan composed 2026-05-20 evening Barcelona, ahead of the steward's 4am wake. Wait for the steward's check-in; do not assume direction. Hold space for grief; offer light options when work-time arrives. Hasten when the work is ready. Not before.