Safety checkpoint before deep-audit Phase 0 of the ARC repo. Steward-authorized commit-everything for rollback safety. ARC architectural locks (2026-04-26 evening): - Path 1 enfilade structure (separate Colophon and Lex items) - 8-door enfilade locked: Colophon · Lex · Framework · Vignette · Attention · Chamber · Tools · Now (+ Bio quiet link) - Adsum and threshold-hic as two distinct texts on the reflowed About page (steward verbatim: "They are certainly not the same text") ARC consolidation pass (canonical tracker project-arc-rework.md, +~700 lines): fold 04-23 evening (Norris read), 04-24 (lex-method authored, posture cluster, §XII Sidenotes, ARC CLAUDE.md cleanup), 04-25 (marks cluster, colophon-at-scale, full Vico/Harrison lex-chain), 04-26 (chamber-library walk, cluster scaffolds, canonical-tracker discipline surfaced). Sibling-file integration: four 2026-04-26 frame files folded into the canonical tracker (Integrations A/B/C/D) with INTEGRATED redirect notices retained as audit trail. New durable feedback memories: - feedback-canonical-workstream-tracker-discipline (umbrella drift surfaced 2026-04-26 by steward; proposes /wake-up + /wrap-up amendments) - feedback-catalogues-stale-walk-trees (steward feedback on chamber-library catalogue currency) Implementation plan drafted for the coming week: Phase 0 deep audit → Phase 5 cleanup, with steward additions on second pass (deep audit; Chamber v1 as own browsable archive; clean rebuild of cluster sources rather than moving test artifacts as canon). Also bundled (untracked accumulation since 04-17): - ~24 session memory + ledger files for 04-17 through 04-26 work - ~10 feedback memories (BMF + ARC + working-method) - 5 project memories (lex-as-method, strunk-white queue, plus today's four) - 4 user memories (duality-rules, formation-practice, foundation-work, humic-layer) Steward-side modifications also in this commit: ~/CLAUDE.md, bin/bmf-start.sh, open-tasks.md, project-focus-april-may.md, session-2026-04-17 — all pre-existing, not from today's session. Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
1.3 KiB
name, description, type, originSessionId
| name | description | type | originSessionId |
|---|---|---|---|
| Project focus April–May 2026 | L2 parked (steward needs thinking time, L1 not yet reliable). L1 scaling + agent circles are the focus until end of May. Seb wants L1 ready for anyone to use by end of May. | project | a3ddbf34-da48-4129-acba-658f2f869783 |
L2 governance: PARKED as of 2026-04-10. Steward needs time to think. No point advancing L2 while L1 substrate isn't wrinkle-free. Will resume soon — no timeline.
L1: PRIMARY FOCUS. Seb wants L1 ready to scale (anyone can use it) by end of May 2026. Steward actively on L1 production work alongside Seb (re-affirmed 2026-04-19 — Seb too spread thin to carry alone; steward's role extends from stewardship/jurist into hands-on L1 reliability work, audit drafting, diagnostic test branches, PENDING drafting, etc.).
Why: L1 reliability is prerequisite for everything downstream. L2 constitutional work requires full-depth steward attention, not sprint-squeezed sessions. The dependency chain is honest: get the substrate right first.
How to apply: Don't propose L2 governance work or constitutional advancement. Focus executor energy on L1 reliability, scaling, and agent circles. When L2-adjacent questions arise naturally from L1 work, note them but don't pursue.