3.3 KiB
3.3 KiB
name, description, metadata
| name | description | metadata | ||||||
|---|---|---|---|---|---|---|---|---|
| session-ledger-2026-05-21 | Practice-of-return ledger maintained by /symmetria — returns, open horizons, recalibrations, authorization moves, sub-agent dialogues, bypasses. Morning wake after 2026-05-20 evening wrap; pulling thread is responsiveness, not advancement (travel + last taxes with Marie + 3h rehearsal day). |
|
Session Ledger — 2026-05-21
Returns
- 2026-05-21T09:53 CEST — wake from overnight pause (~15h after 2026-05-20 ~18:55 wrap). Thread validity gate: confirmed in shape (Stage F dwellings cluster is what branch waits for; today is explicitly not a Stage F day per Path B + day-shape). Literal question held open: how is the steward's energy after the morning's taxes filing with Marie — and what shape of work, if any, fits the afternoon? Symmetria init.
Open horizons
- Stage F dwellings cluster session (~3h focused) — the gate that closes branch
docs/spec-extraction-2026-05(26 ahead of main, pushed both remotes). Waits for fresh-energy day, not today. - Merge + deploy ARC — both gated on Stage F per Path B (locked 2026-05-20 evening).
- Today's light options (per
plan-day-2026-05-21.md):αCOMPLETED 2026-05-20 evening before laptop close (per steward correction this morning; corroborated by 18:55 diary entry + session memory file). Remaining: β status-block housekeeping (small commit; reconciles spec stamps with reality) · γ Stage F prep document (maps work, no implementation)./wrap-upritual - Stale SessionStart hook artifact — March 5 BMF handoff surfacing via broken hook (#1440 + #1538 fixed on develop, awaiting release). Not actionable today; noted so it doesn't read as current.
Confidence to recalibrate
- Hold from yesterday afternoon/evening:
trust-prose-over-read-makefile·audit-delta-claim-incomplete-on-dead-data-fields·spec-said-NOT-X-rendering-said-X-needed·link-decoration-override-creates-de-facto-spec-exception. - Hold from week:
naming-the-gap-honestly-not-sufficient(KG valid_from 2026-05-19) — at any gap (context/tool/judgement), name + ask OR honor by slow path; never compose past it. - Hold from week: Live-State Discipline — spec text records what IS; status blocks record what is pending; spec text ships ahead of live only when the spec IS the implementation.
- τὸ πρόσφορον includes the time the task requires — particularly relevant on a fragmented day; responsiveness over advancement is the steward's named posture for today.
Authorization moves
- 2026-05-22 — Steward chose β (status-block housekeeping). Four authorized edits proposed; steward authorized two §5 + frontmatter judgment promotions ("promote both, apply all four"). Then authorized scope expansion to include two cross-ref reconciliations in AldineXXI Companion Spec Index + CLAUDE.md companion-spec orientation ("single atomic commit"). Result:
e7cd960ondocs/spec-extraction-2026-05, 4 files / 9+/9− lines, pre-commit hooks passed, branch 27 ahead of main, 1 ahead of remote (not pushed by design — same Path B discipline carries: merge + deploy wait for Stage F).
Sub-agent dialogues
(none yet this session)
Bypasses
(none yet this session)