Files
dotfiles/claude/memory/project-mempalace-role-as-instrumentation.md
T

3.0 KiB

name, description, type, originSessionId
name description type originSessionId
MemPalace's role — instrumentation for steward+Claude collaboration during BMF L1-degraded period MemPalace is not a deliverable, not a long-term substrate, not part of CapableMind. It is a working tool the steward chose to instrument our collaboration while BMF L1 reliability is being fixed. Holds 100% verbatim recall locally so that working memory across sessions is not dependent on BMF. project 597aba4e-942b-4f20-8a89-3d801b14c971

MemPalace's role in the current period

Steward verbatim 2026-05-01: "Seb has nothing to do with mempalace — I am using it to help us while we finish the BMF L1 problems. Mempalace is its own project and I am using it to help me to help you to help me."

Why: BMF L1 has been unreliable through April (deep-audit work since 2026-04-19; latest pathology surfaced 2026-04-30 — 1,349 index segments + 25k transactions in lance store, NOT issue #10). While L1 is being repaired, the steward needs a memory substrate that works now — verbatim recall, local, no API, no cloud dependency. MemPalace is that stand-in. The chain "I am using it to help me to help you to help me" is precise: steward → MemPalace → executor's working context → steward's continuity.

How to apply:

  • Don't conflate territory. MemPalace is its own open-source project (Yousef Amar et al.). It has its own contributors, PRs, issues, design philosophy (~/_Dev/mempalace/CLAUDE.md: "Memory is identity… 100% recall is the design requirement"). It is not BMF, not L2, not CapableMind. Seb is not in the loop.
  • Don't propose MemPalace as a permanent substrate. It is the right tool now because L1 isn't ready. When BMF L1 reaches reliability, the architectural question of how MemPalace and L1 relate is a separate later decision — not for the executor to pre-empt.
  • Treat MemPalace work as enabling work, not deliverable work. Time invested in MemPalace transition (bge-m3 + MPS, sub-room granularity, future updates) is overhead in service of the actual work — ARC, L2 governance docs, BMF L1 audit support. The steward's 2026-05-01 "I almost regret doing" about the bge-m3 transition is a signal that the overhead has felt disproportionate; keep transition work proportionate to its instrumental purpose.
  • Upstream MemPalace conversations (PRs, issues, contributors) belong to MemPalace's own ecosystem — never refer as "Seb's network" or similar BMF-orbit phrasing. See feedback-arc-territory-steward-and-claude-code-only.md for the broader territory rule.

Operationally for current period (through bge-m3+MPS transition completion):

  • Chamber-library wing first (in flight 2026-05-01)
  • Phases 4b/c/d (Obsidian vault, Claude transcripts, CapableMind thinking) sequential overnight runs after
  • Discipline changes deferred until mine completes per steward 2026-05-01

When the transition completes and MemPalace is stable on the new substrate, the question shifts back to BMF L1 audit work + the live ARC/L2 work — MemPalace returns to background instrumentation.