Files
dotfiles/claude/memory/project-focus-april-may.md
David F GliddenandClaude Opus 4.8 3f9a89b00c chore(memory): Basic Memory trial begins — sync normalization baseline (283 files)
Basic Memory v0.21.6 first sync over the live memory dir (steward-authorized
live-dir trial, Option A 2026-06-06): adds permalink: to frontmatter, refolds
long YAML description lines, strips final newlines. Bodies untouched —
verified via full diff classification. From this commit forward, any diff in
claude/memory shows only what Basic Memory or the session writes.

Trial design: MemPalace untouched as incumbent; git status check on this dir
at every wrap; end-of-day evaluation (recall quality, sync robustness,
rebuild-from-files, malformed-file behavior).

Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
2026-06-06 09:52:17 +02:00

1.3 KiB
Raw Permalink Blame History

name, description, type, originSessionId, permalink
name description type originSessionId permalink
Project focus April–May 2026 L2 parked (steward needs thinking time, L1 not yet reliable). L1 scaling + agent circles are the focus until end of May. Seb wants L1 ready for anyone to use by end of May. project a3ddbf34-da48-4129-acba-658f2f869783 claude-memory/project-focus-april-may

L2 governance: PARKED as of 2026-04-10. Steward needs time to think. No point advancing L2 while L1 substrate isn't wrinkle-free. Will resume soon — no timeline.

L1: PRIMARY FOCUS. Seb wants L1 ready to scale (anyone can use it) by end of May 2026. Steward actively on L1 production work alongside Seb (re-affirmed 2026-04-19 — Seb too spread thin to carry alone; steward's role extends from stewardship/jurist into hands-on L1 reliability work, audit drafting, diagnostic test branches, PENDING drafting, etc.).

Why: L1 reliability is prerequisite for everything downstream. L2 constitutional work requires full-depth steward attention, not sprint-squeezed sessions. The dependency chain is honest: get the substrate right first.

How to apply: Don't propose L2 governance work or constitutional advancement. Focus executor energy on L1 reliability, scaling, and agent circles. When L2-adjacent questions arise naturally from L1 work, note them but don't pursue.