Files
dotfiles/claude/memory/project-focus-april-may.md
T
David F GliddenandClaude Opus 4.7 e9e772d69c memory: bundle accumulated 04-17/26 + lock ARC about-page architecture
Safety checkpoint before deep-audit Phase 0 of the ARC repo. Steward-authorized
commit-everything for rollback safety.

ARC architectural locks (2026-04-26 evening):
- Path 1 enfilade structure (separate Colophon and Lex items)
- 8-door enfilade locked: Colophon · Lex · Framework · Vignette · Attention ·
  Chamber · Tools · Now (+ Bio quiet link)
- Adsum and threshold-hic as two distinct texts on the reflowed About page
  (steward verbatim: "They are certainly not the same text")

ARC consolidation pass (canonical tracker project-arc-rework.md, +~700 lines):
fold 04-23 evening (Norris read), 04-24 (lex-method authored, posture cluster,
§XII Sidenotes, ARC CLAUDE.md cleanup), 04-25 (marks cluster, colophon-at-scale,
full Vico/Harrison lex-chain), 04-26 (chamber-library walk, cluster scaffolds,
canonical-tracker discipline surfaced).

Sibling-file integration: four 2026-04-26 frame files folded into the canonical
tracker (Integrations A/B/C/D) with INTEGRATED redirect notices retained as
audit trail.

New durable feedback memories:
- feedback-canonical-workstream-tracker-discipline (umbrella drift surfaced
  2026-04-26 by steward; proposes /wake-up + /wrap-up amendments)
- feedback-catalogues-stale-walk-trees (steward feedback on chamber-library
  catalogue currency)

Implementation plan drafted for the coming week: Phase 0 deep audit → Phase 5
cleanup, with steward additions on second pass (deep audit; Chamber v1 as own
browsable archive; clean rebuild of cluster sources rather than moving test
artifacts as canon).

Also bundled (untracked accumulation since 04-17):
- ~24 session memory + ledger files for 04-17 through 04-26 work
- ~10 feedback memories (BMF + ARC + working-method)
- 5 project memories (lex-as-method, strunk-white queue, plus today's four)
- 4 user memories (duality-rules, formation-practice, foundation-work, humic-layer)

Steward-side modifications also in this commit: ~/CLAUDE.md, bin/bmf-start.sh,
open-tasks.md, project-focus-april-may.md, session-2026-04-17 — all
pre-existing, not from today's session.

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
2026-04-26 14:52:14 +02:00

14 lines
1.3 KiB
Markdown
Raw Blame History

This file contains ambiguous Unicode characters
This file contains Unicode characters that might be confused with other characters. If you think that this is intentional, you can safely ignore this warning. Use the Escape button to reveal them.
---
name: Project focus April–May 2026
description: L2 parked (steward needs thinking time, L1 not yet reliable). L1 scaling + agent circles are the focus until end of May. Seb wants L1 ready for anyone to use by end of May.
type: project
originSessionId: a3ddbf34-da48-4129-acba-658f2f869783
---
**L2 governance: PARKED** as of 2026-04-10. Steward needs time to think. No point advancing L2 while L1 substrate isn't wrinkle-free. Will resume soon — no timeline.
**L1: PRIMARY FOCUS.** Seb wants L1 ready to scale (anyone can use it) by end of May 2026. **Steward actively on L1 production work alongside Seb** (re-affirmed 2026-04-19 — Seb too spread thin to carry alone; steward's role extends from stewardship/jurist into hands-on L1 reliability work, audit drafting, diagnostic test branches, PENDING drafting, etc.).
**Why:** L1 reliability is prerequisite for everything downstream. L2 constitutional work requires full-depth steward attention, not sprint-squeezed sessions. The dependency chain is honest: get the substrate right first.
**How to apply:** Don't propose L2 governance work or constitutional advancement. Focus executor energy on L1 reliability, scaling, and agent circles. When L2-adjacent questions arise naturally from L1 work, note them but don't pursue.