11 KiB
name, description, metadata
| name | description | metadata | ||||||||
|---|---|---|---|---|---|---|---|---|---|---|
| arc-open-work-register-the-single-verified-source-of-truth-post-stage-g | Consolidated, code-verified list of what remains OPEN on ARC after Stage G was sealed (2026-06-10). Reconciles the scattered tracking surfaces — the chronological tracker, the ~10 standalone project-arc-* files, PENDING.md, the spec's Phase-2/held set, and content sweeps — against actual code/live state. Built 2026-06-11 because the records had drifted BOTH ways (real open work hidden; done work mislabeled "pending"). Supersedes the standalone "-pending" files for STATUS; those remain for detail. The chronological narrative stays in project-arc-rework.md; this carries current open-work truth. |
|
ARC open-work register
Single source of truth for what is OPEN on ARC. Built 2026-06-11, ARC main @ b220620, live. Each item verified against code/live where marked [verified]; [VERIFY] = status uncertain, check before calling done. The rigorous spec↔code half is /spec-code-audit; this register also carries the content/governance/Phase-2 surfaces that audit does not.
Why this exists. Stage G (sealed 2026-06-10) closed the spec, not ARC's work. Open items were scattered across the tracker, ten standalone
project-arc-*files, PENDING.md, the spec's held set, and content sweeps in no spec. On 2026-06-11 several of those surfaces proved drifted in both directions (the AldineXXI selector index listed shipped features as "planned"; "pending" files described done work; real work sat unlisted). This register is the reckoning.
Legend: [OPEN] real remaining work · [DEFERRED] open by design, trigger-gated (Phase-2 / held / first-instance) · [DONE—retire] verified complete, the tracking file should be retired/archived · [VERIFY] needs a check.
A — Open build work (the two undesigned-SVG-asset items the spec names but never realized)
- A1. Vignette (F+1) — the big remaining build.
[OPEN][verified] — 0.vignetterules in compiled CSS, nothing rendered. Spec ready:vignette-specification.md(revised 2026-06-07, PENDING-31; build-time SVG+CSS renderer, Phase-α engine, zero-JS, AldineXXI §IX). Brief:drafts/vignette-spec-revision-brief-2026-05-28.md. The largest open build; the steward named it as "the big thing left." - A2. The cul-de-lampe — the designed Pause/Close ornament asset.
[OPEN — undesigned][verified] — AldineXXI §IV names the function (Pause = rare within-piece breath, smaller scale; Close = end-of-piece, the punto finale, full scale — "the visual signature of completion; finis coronat opus") but the actual designed SVG cul-de-lampe is undetermined — spec §IV "Open question: the designed Pause/Close ornament itself" [OPEN — 2026-05-03], "the asset itself is yet to be determined." [verified]: compiled CSS still carries the retired classes (.ornament.completion,.ornament.section,.ornament.chapter, …) and has no.ornament.close/.ornament.pause— the asset was never designed, so the migration never ran (interim: the three-dot.ornamentfrom the 06-07 hr doctrine stands in for Pause-at-threshold). Sibling to A1. Design sub-questions (one asset at two scales vs paired-distinct; motif lineage — Aldine cul-de-lampe vs Roman/Pompeian) inproject-arc-pause-close-ornament-and-hr-audit-pending. The content half is B3. (Caught by the steward 2026-06-11 — it was buried under the generic "ornament migration"; it deserves its own line as the crown of every finished piece.)
B — Open content sweeps (largely steward-owned, manual)
- B1. Glimpse location + title cleanup.
[OPEN — steward manual][verified] — steward does this by hand (2026-06-11). 193 live glimpses; 4 lacklocation:frontmatter; titles need a cleanup pass. NB the glimpse rendering bugs (phone full-bleed, no-vessel) were fixed + deployed in Stage M — this is content/metadata, not code. Absorbs the residual ofproject-arc-apparatus-refactor-todoTier 3 (EXIF/location for existing glimpses — now ~done). - B2. Threshold-
---promotion walk.[OPEN — steward content track]— apply the 2026-06-07 differentiated-hr doctrine across existing pieces: a bare---at a foreword→main-text threshold becomes.ornament(dots);---within the body stays silence. Doctrine + CSS settled (§IV amended, zero CSS change); the per-piece content walk remains. - B3. Ornament content migration (Option A) — the content half of A2.
[OPEN — gated on A2; scope VERIFIED 2026-06-11]— steward ruled Option A (2026-05-03): once the cul-de-lampe asset exists (A2), migrate content off the retired-ornament classes onto the canonical Close/Pause, then retire the old SCSS. Verified scope (sizable): ~95 content files carry hand-authored<div class="ornament …"></div>—completion×51 (= the Close / end-of-piece, the cul-de-lampe's job),section×50,thought×14,chamber×12,musical×7,hermetic×5,mathematical×2, … Several variants (thought,mathematical) aren't even in the current CSS → they already collapse to bare.ornament. All retired per §IV; all await the designed asset. Not negligible, and not runnable until A2. Files:project-arc-ornament-spec-vs-content-mismatch-pending,project-arc-pause-close-ornament-and-hr-audit-pending. - B4. Major content audit / archive of non-current files.
[OPEN — was deferred]— per ARCCLAUDE.mdKnown state: deferred until "the current version of the site is established; do not rearrange the content tree until that session." Stage G sealed arguably satisfies that condition now — candidate to schedule.
C — Deferred by design (Phase-2 / held — trigger-gated, NOT drift)
- C1. Print/PDF posture +
arc-typography.styv0.3.[DEFERRED — Phase-2]— build the Print/PDF LaTeX templates; updatetools/latex/arc-typography.sty(v0.2, found stale vs current doctrine 2026-06-10) to current spec (posture-aware ragged/justified, Medium headings, 27.2rem measure, British quote-norm, xelatex glyph routing). Governs all future ARC PDFs. File:project-arc-pdf-print-postures-session-plan. - C2. OpenType feature catalogue (§I.i.j).
[DEFERRED — Phase-2]— feature→CSS mapping; the Stage-G audit (06-09) enumerated the set; the session opens against it. (zeroabsent from every EB Garamond face — recorded.) - C3. Held companions — Appendix D.
[DEFERRED — Phase-2]— Navigation Philosophy, Print Stylesheet, Footnotes — named, not drafted; reactive, no date. - C4. §VII.d Footnotes / Endnotes.
[DEFERRED — first-instance]— research/parked pending the first essay that needs the register. - C5. Held typographic options.
[DEFERRED — held]— justification (→ print spec), hanging-punctuation (→ browser Baseline), word-spacing (held at 0.20em default), reader font-size control (held; the banish-JS gate's one named exception). - C6. Tombeau route.
[DEFERRED — first-instance]— governed-but-unsurfaced; route + Compass slot emerge with the first Tombeau piece (non-convergence). - C7. Capsule apparatus.
[DEFERRED — first-instance]— deferred, not rejected; reopens when pedagogical-treatise content begins (§XII.e locks with first instance). File:project-arc-capsule-apparatus-deferred-2026-05-05. - C8. Per-piece epigraph chancery features; metric-matched font fallbacks.
[DEFERRED]— first-instance (epigraph chanceryswsh+init+fina) / empirical SCSS-audit candidate (font-metric overrides).
D — Governance debt
- D1. Place outstanding REVIEWED entries.
[OPEN — steward writes REVIEWED]— PENDING-32 and PENDING-33 await REVIEWED placement; REVIEWED-36, 37, 38, 39, 40, 43 are drafted-for-placement (executed work, entries not yet placed). Constitutional: David/Claude.app write REVIEWED, not Claude Code.
E — Stale "pending" files — verified DONE; retire or archive
- E1.
project-arc-breadcrumb-spec-pending→[DONE—retire][verified] — breadcrumb componentized + governed permanent sibling (2026-06-03);.breadcrumblives in_navigation.scss. - E2.
project-arc-mimesis-acquisition-debt→[DONE—archive]— RESOLVED 2026-05-20 (stated in-file). Chamber-library import, not ARC-site work. - E3.
project-arc-404-page-design-pending→[DONE—retire][verified 2026-06-11] — the file predates the §VII.h spec and is stale. Apparatus §VII.h (ADDED 2026-05-20) governs the 404;content/404.md+ built_site/404.htmlconform exactly:<title>Animal Rationis Capax</title>, body "No text at this address.", real 404 via CloudFlare. Built and conformant, not "design pending." (Any future Close-ornament on it rides A2.) - E4.
project-arc-apparatus-refactor-todo-2026-05-06→[DONE—retire]— Tier 1/2 shipped (e2fb14c/249475b); Tier 3 glimpse location ~done (189/193) → residual in B1. - E5.
project-arc-spec-master-typographer-audit-pending→[DONE—retire — superseded][verified 2026-06-11] — the masters-compliance pass was performed:_audits/deep-typographic-audit-2026-06-09.mdexists (6-agent, masters folded), atop the 06-07 full bidirectional + 06-10 spec↔spec coherence audits. Retire unless a specific uncovered master-compliance dimension is named. - E6.
project-arc-web-typography-spec-coverage→[DONE—retire][verified 2026-06-11] — Tier 1 all DONE (Lists/Code/Headings); Tier 2/3 DONE (Selection, Tables, Numerals, Smart-punct via §I.k). Only residual = the<abbr>/<mark>"styled-but-never-specced" corner; no ARC content meaningfully uses them — negligible, deferrable.
F — The chronological tracker
project-arc-rework.md is the narrative record, true through 2026-06-07 evening (last entry: the pre-3R Fowler note). It is owed compact appends for 06-08 → 06-11: W3R re-partition close + deploy; Wave 5 + measure→72ch + soft rag; Stage G CLOSED + reconciled + SEALED + GPG-signed (06-10); §VII.f running head + W1.15 compass presence-reveal shipped (06-11). The tracker's "CANONICAL STAGE STATUS" line (≈L3852, "as of 2026-06-05") is stale. This register now carries current open-work truth; the tracker carries the story. Tracker annotated to point here (2026-06-11).
Maintenance: update this register as items close; move [DONE—retire] files to an archive; promote [VERIFY] to a verdict once checked. Canonical current-state for ARC open work lives HERE — not in the scattered files, and not inferred from "Stage G is done."