Files
dotfiles/claude/memory/plan-day-2026-05-21.md
T

108 lines
6.9 KiB
Markdown
Raw Blame History

This file contains ambiguous Unicode characters
This file contains Unicode characters that might be confused with other characters. If you think that this is intentional, you can safely ignore this warning. Use the Escape button to reveal them.
---
name: plan-day-2026-05-21
description: "Day-plan for Wednesday 2026-05-21 — travel Barcelona → Paris (6am flight), last taxes filing with Marie, 3h rehearsal. 2–3h max work time, fragmented. Closure + light maintenance posture; not a Stage F day. Three light options laid out (α Phase 6 wrap-up; β status-block housekeeping; γ Stage F prep document). Default: α first, β if energy holds; γ only if a third hour materialises."
metadata:
type: project
originSessionId: planning-2026-05-20-evening
---
# Day Plan — 2026-05-21 (Wednesday, Barcelona → Paris)
## Frame
- 4am wake; 6am flight from Barcelona; arrive Paris mid-morning
- **Last taxes filing with Marie** (procedurally easy; emotionally weighted — *sad*, the steward named it)
- One 3-hour rehearsal in afternoon
- **2–3h max work time, fragmented across the day**
- Energy curve: low-to-medium throughout; no focused-implementation block possible
- *τὸ πρόσφορον — what is fitting includes the time the day actually gives*
## What does NOT happen today
- **Stage F (dwellings cluster + new Compass sigils).** Wrong day for it. Needs fresh-energy focused block (~3h continuous, deep concentration across site.hs + templates + SCSS + multiple type routes). Deferred to next focused-energy day.
- **Merge + deploy.** Per Path B chosen 2026-05-20 evening: merge and deploy wait until Stage F closes the corpus-Compass gap. Today's branch sits where it is.
- **New spec authoring.** None is owed.
- **Composition.** No new prose work scheduled. Hagen Quartett Hommage held with grief.
## What CAN happen today (choose based on energy)
Three light items, any single one fits a ~1h window between travel / taxes / rehearsal:
### Option α — Phase 6 wrap-up (carried from 2026-05-20)
Three items remaining from yesterday's wrap-up:
- `/wrap-up` ritual invocation (steward action — captures session memory cleanly via the skill)
- Final commit shape check — confirm both remotes carry today's branch state (already verified 2026-05-20 evening; confirm again if anything shifted)
- Read yesterday's end-of-day record in `plan-day-2026-05-20.md` to re-orient
End-of-day record + `project-arc-rework.md` canonical tracker update + remote verification were completed 2026-05-20 evening before sign-off, so most of Phase 6 is done. What remains is the `/wrap-up` skill invocation itself.
~15–30 min. Fully mechanical. **Best done first** to clear the deck and arrive in the new day cleanly.
### Option β — Status-block housekeeping commit
Small follow-on for the spec corpus's stale stamps (per the 2026-05-20 "to do" inventory):
- `content-typology-specification.md` status header: §2 / §3 / §4 / §6 stamps from "DRAFT, pending Stage E" → "AUTHORED, pending Stage G jurist review"
- `content-typology-specification.md` §1 header: DRAFT → LOCKED (all 14 types individually LOCKED)
- `content-typology-specification.md` §5 Code Binding Contract: LOCKED stamp if substance is complete, or named gap surfaced
- `essay-versioning-specification.md` + `frontmatter-specification.md` header DRAFT stamps: read-through to confirm whether stale or accurate; reconcile
Single atomic commit. ~45–60 min. Low energy; mostly reading + small edits. Brings spec corpus's stated state in line with its actual state — Live-State Discipline applied to the headers themselves.
### Option γ — Stage F prep document
A step-by-step implementation plan for the dwellings cluster session (without implementing). Maps the work cleanly so the focused-energy day can execute without re-deriving scope:
- The Photo Essay ⊙→◧ swap: exact site.hs lines, template references, route impact
- Dwellings cluster ⊙ for Meditation + Reverie: route file structure, index template, listing logic
- New Compass slots: ❦ Hommage, ⁂ Heteronym, ☾ Dream (cosmological pairing rationale per content-typology §1)
- Default.html Compass-row template edits
- Per-type index pages (HTML structure, frontmatter, what each lists)
- Reading-test path for each new slot
- Atomic-commit shape
Writes to `docs/AldineXXI-Codex/drafts/stage-f-dwellings-cluster-plan-2026-05-21.md` or similar. ~60–75 min. Higher cognitive load than α / β; needs reading and structural thinking. Best if energy permits.
## Recommended sequencing
If today actually delivers ~2h of work-time:
1. **First** — Option α (Phase 6 wrap-up closure). ~15–30 min. Closes yesterday cleanly via the `/wrap-up` skill.
2. **Second** (if energy holds, post-rehearsal or before bed) — Option β (status-block housekeeping). ~45–60 min. Mechanical and satisfying; cleans the spec corpus without requiring deep concentration.
If only ~1h is available: just α. Closure beats new work on a travel day.
If energy holds beyond α + β and a third hour materialises: Option γ. But don't push.
**If energy doesn't materialise at all today**: that is also fine. The branch sits at `04f9d8b`, 26 commits ahead of main, pushed both remotes. Nothing is at risk. Tomorrow or whenever is a new day.
## Branch state at session-start
`docs/spec-extraction-2026-05` at `04f9d8b`, 26 commits ahead of `main`, pushed both remotes (origin Skemantix + github-backup). Working tree clean (font-backup directories untouched; pre-existing noise carried forward).
## What's pulling (carried from 2026-05-20)
- Stage F dwellings cluster session — waiting for fresh-energy day (≥3h continuous block; not today)
- Merge + deploy — gated on Stage F per Path B (chosen 2026-05-20 evening)
- Hagen Quartett Hommage — held with grief
## Discipline reminders
- **Travel days are good for orientation + reading + planning.** Bad for focused implementation.
- **Taxes filing with Marie has its own emotional load.** Procedurally easy, the steward said; sad. Don't sandwich work blocks tightly around it. The grief gets its own room.
- **Three-hour rehearsal is high-energy work.** Music-presence is its own demand. Don't crowd it with anticipation.
- **Bien-fait per Prime Directive** — proportion, fittingness, durability. A day with three external demands is not a day to also push major implementation work.
- **The day's posture is *closure + light maintenance*, not advancement.** Both are honorable. *τὸ πρόσφορον — what is fitting includes the time the task requires.*
## Pulling thread + literal question
**Pulling thread**: nothing pulls forcefully. The branch is at rest; Stage F waits; the merge and deploy wait. Today's posture is responsiveness to what the day actually gives, not advancement.
**Literal question for next-Claude (carried from 2026-05-20)**: *How is the steward's energy after the morning's taxes filing with Marie — and what shape of work, if any, fits the afternoon?*
---
*Plan composed 2026-05-20 evening Barcelona, ahead of the steward's 4am wake. Wait for the steward's check-in; do not assume direction. Hold space for grief; offer light options when work-time arrives. Hasten when the work is ready. Not before.*