Cluster A complete (I15, I16, I17). AF-7 advances immediately as
post-authorization action item.
Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com>
DN-GOV-05 (Bounded Self-Repair): design commitment with suspension
clause — enforcement not active until AF-7 reaches design commitment.
DN-GOV-06 (Temporal Authorization Shift): design commitment with
suspension clause + jurist constraint: temporal shift does not relax
the four-condition test, only changes who initiates.
DN-GOV-07 (Threshold Already Crossed): framing document with two
additions: working framing explicitly provisional, counter-norm on
inherited legitimacy (each crossing requires independent warrant).
AF-7 escalated to urgently load-bearing — condition for suspension
clause lifting.
Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com>